Filter Search for grants
Call Navigation
Deadline expired
The deadline for this call has expired.
Call key data
Alternative Fuel Infrastructure Facility - Unit Contributions (Cohesion Countries) - 5th cut-off date
Funding Program
Connecting Europe Facility for Transport
Call number
CEF-T-2021-AFIFCOEN-UNITS
deadlines
Opening
16.09.2021
Deadline
19.09.2023 17:00
Call budget
€ 125,000,000.00
Link to the call
Link to the submission
Call content
short description
The objective is to support the deployment of Alternative Fuel supply infrastructure, contributing to decarbonising transport along the TEN-T network.
Call objectives
The activities that can be funded under this call are relating to the deployment of Alternative fuel supply networks as defined in section 6.2.2 of the multiannual work programme.
The infrastructure shall be deployed in accordance with Directive 2014/94/EU and with Regulation 1315/2013 in line with the requirements listed in the call document:
Actions supporting the roll-out of electricity fast-charging infrastructure of a minimum power output of 150kW, including electricity grid connexion, on the TEN-T road network.
- Publicly accessible recharging stations along the TEN-T road network:
- Infrastructure
- Publicly accessible recharging stations dedicated to light-duty vehicles, with a minimum power output of 150 kW.
- Publicly accessible recharging stations dedicated to heavy-duty vehicles with a minimum power output of 350 kW.
- Grid connection with a minimum power capacity of 600kVA.
- Location
- The recharging infrastructure must be located on the relevant TEN-T road sections identified in the “eligibility map” (https://ec.europa.eu/transport/infrastructure/tentec/tentec-portal/map/docs/AFIF1_2_150kw_350kw.pdf). A buffer of 2km driving distance from the TEN-T road network is applicable, calculated from the closest exit.
- Infrastructure
- Publicly accessible recharging stations on safe and secure parkings along the TEN-T road network:
- Infrastructure
- Publicly accessible recharging stations dedicated to heavy-duty vehicles with a minimum power output of 150 kW.
- Grid connection with a minimum power capacity of 600kVA.
- Location
- Safe and secure parking areas on the road Core network and its nodes, or on the road Comprehensive network if they primarily serve users of the road Core network, for trucks and commercial vehicles.
- Infrastructure
- Publicly accessible recharging stations in urban nodes:
- Infrastructure
- Only recharging stations for heavy-duty vehicles with recharging points with a minimum power output of 350 kW.
- Grid connection with a minimum power capacity of 600kVA.
- Location
- Urban nodes, listed in Annex II.2 of the TEN-T Regulation.
- Infrastructure
Costs related to vehicles will not be eligible.
read more
Eligibility Criteria
Regions / countries for funding
eligible entities
Other, Private institution, incl. private company (private for profit), Public Body (national, regional and local; incl. EGTCs), Small and medium-sized enterprise (SME)
Mandatory partnership
No
Project Partnership
Proposals shall be submitted by:
- one or more EU Member States
- by international organisations, joint undertakings, or public or private undertakings or bodies established in Member States (with the agreement of the Member States concerned).
In order to be eligible, the applicants (beneficiaries and affiliated entities) must:
- be legal entities (public or private bodies)
- be established in one of the eligible countries, i.e.
- EU Member States (including overseas countries and territories (OCTs))
- third countries associated to the CEF
Specific cases:
- Entities from other countries are exceptionally eligible for projects of common interest in the field of transport, energyand digital and for cross-border projects in the field of renewable energy, if the granting authority considers their participation essential for the implementation of the action.
- Natural persons are NOT eligible (with the exception of self-employed persons, i.e. sole traders, where the company does not have legalpersonality separate from that of the natural person).
- International organisations are eligible. The rules on eligible countries do not apply to them.
- Entities without legal personality under their national law may exceptionally participate, provided that their representatives have the capacity to undertake legal obligations on their behalf, and offer guaranteesfor the protection of the EU financial interests equivalent to that offered by legal persons.
- EU bodies (with the exception of the European Commission Joint Research Centre) can NOT be part of the consortium.
other eligibility criteria
Additional information
Topics
UN Sustainable Development Goals (UN-SDGs)
Additional Information
The available call budget for Alternative Fuels Infrastructure Facility – Cohesion envelope (CEF-T-2021-AFIFCOEN) is EUR 375,000,000. (EUR 125,000,000 per year)
In order to ensure efficiency in EU funding interventions, applicants are strongly encouraged to submit applications for projects with a total requested EU contribution to the eligible costs of no less than EUR 1,000,000. Where possible, related projects should be grouped and submitted as one proposal.
The grant will be a unit grant. This means that it will reimburse a fixed amount per unit, based on unit costs, unit contributions or financing not linked to costs, as follows:
- Unit contributions for electric vehicle recharging points of minimum150 kW and minimum 350 kW:
- Recharging point of minimum 150 kW: EUR 30,000 per unit
- Recharging point of minimum 350 kW: EUR 60,000 per unit
- Unit contribution for grid connection: EUR 30,000 per unit
Proposal page limits and layout:
- Part A to be filled in directly online (administrative information, summarised budget, call-specific questions, etc.)
- Part B to be downloaded from the Portal submission system, completed and re-uploaded as a PDF in the system
- mandatory annexes and supporting documents (to be uploaded):
- detailed budget table per WP (template available in the Submission System)
- activity reports of last year
- list of previous projects (key projects for the last 4 years) (template available in Part B)
- timetable/Gantt chart
- agreement by the concerned Member States (letters of support)
- environmental compliance file
- financing approval letter (consisting of a transmittal letter certifying the approval of the financing by the financial institution’s governing bodies in line with its own rules, policies and procedures, and the project summary sheet)
- simplified cost-benefit analysis (CBA) if the project is supported with financing of a non-Implementing Partner financial institution.
To see more information about this call, you can register for free here
or log in with an existing account.
Log in
Register now