Filter Search for grants
Call Navigation
Call key data
SESAR Common Project One implementation projects – works
Funding Program
Connecting Europe Facility for Transport
Call number
CEF-T-2024-SIMOBGEN-SESAR-CP-WORKS
deadlines
Opening
24.09.2024
Deadline
21.01.2025 17:00
Funding rate
50-70%
Call budget
€ 640,000,000.00
Link to the call
Link to the submission
Call content
short description
The objective is to modernise air transport infrastructure on the TEN-T Network.
Call objectives
In accordance with the Article 9(2)(b)(ii) of the CEF Regulation, works related to the timely and synchronised implementation of Common Project One (Commission Implementing Regulation (EU) 2021/116 of 1/02/2021) in accordance with the deployment approach defined in the SESAR Deployment Programme (39) will be supported.
This Call for Proposals addresses the short-term implementation needs stemming from the SESAR Deployment Programme (SDP). These needs are defined considering: technical aspects, which make the related sub-functionalities essential to advance in the implementation of the overarching ATM functionality; the implementation status of the relevant ATM functionalities or sub-functionalities, aiming to fill any current implementation gaps; and the contribution to network performance, focussing on the SESAR Deployment Programme ‘Families’ that mostly contribute to network performance improvements, to digitalisation and to the objectives of the European Green Deal.
Implementation projects (Article 10 of Commission Implementing Regulation (EU) No 409/2013) related to any of the following sub-functionalities defined in the Annex of the Commission Implementing Regulation (EU) 2021/116 of 1/02/2021 will be supported under this topic:
- ATM sub-functionality on AMAN/DMAN Integration (SDP Family 1.2.1). Projects should implement as a minimum: coupling AMAN and DMAN systems and integrate the sequence building processes;
- ATM sub-functionality on Extended AOP (SDP Family 2.2.2). Projects should implement as a minimum: extended AOP Data/Operational elements implementation and Airport Performance Services implementation;
- ATM sub-functionality on AOP/NOP Integration (SDP Family 4.4.1). Projects should implement as a minimum: Integration of Airport systems with NOP;
- ATM sub-functionality on Initial A/G Trajectory Information Sharing (airborne) (SDP Family 6.1.1). Projects should implement as a minimum: avionics upgrades;
- ATM sub-functionality on Initial A/G Trajectory Information Sharing (ground) (SDP Family 6.1.2). Projects should implement as a minimum: local system upgrades and data integration;
- ATM sub-functionality on Initial Trajectory Information Sharing Ground Distribution (SDP Family 6.3.1). Projects should implement as a minimum: the connection
read more
Eligibility Criteria
Regions / countries for funding
Moldova (Moldova), Ukraine (Україна)
eligible entities
Education and training institution, International organization, Non-Profit Organisation (NPO) / Non-Governmental Organisation (NGO), Other, Private institution, incl. private company (private for profit), Public Body (national, regional and local; incl. EGTCs), Research Institution incl. University, Small and medium-sized enterprise (SME)
Mandatory partnership
No
Project Partnership
In order to be eligible, the applicants (beneficiaries and affiliated entities) must:
- be legal entities (public or private bodies)
- be established in one of the eligible countries, i.e.
- EU Member States (including overseas countries and territories (OCTs))
- Third countries associated to the CEF Programme (list of participating countries)
Specific cases:
- Project applications located in associated third countries are eligible for funding in the present calls under the conditions set out in Article 8(1) of the TEN-T Regulation (EU) N° 1315/2013 and Articles 5(2) and 9(2) of the CEF Regulation (EU) 2021/1153.
- Exceptional funding — Entities from other countries (not listed above) are exceptionally eligible for projects of common interest in the field of transport if the granting authority considers their participation essential for the implementation of the project.
- Natural persons are NOT eligible (with the exception of self-employed persons, i.e. sole traders, where the company does not have legalpersonality separate from that of the natural person).
- International organisations are eligible. The rules on eligible countries do not apply to them.
- Entities without legal personality under their national law may exceptionally participate, provided that their representatives have the capacity to undertake legal obligations on their behalf, and offer guaranteesfor the protection of the EU financial interests equivalent to that offered by legal persons.
- EU bodies can NOT be part of the consortium.
other eligibility criteria
Financial support to third parties is not allowed.
The available call budget is split between 10 calls for proposals:
- CEF-T-2024-SIMOBGEN-ERTMS-UNITS: ERTMS – unit contribution
- CEF-T-2024-SIMOBGEN-ITS-WORKS: ITS – studies, works or mixed
- CEF-T-2024-SIMOBGEN-RIS-WORKS: RIS – studies, works or mixed
- CEF-T-2024-SIMOBGEN-EMSWe-WORKS: EMSWe – studies, works or mixed
- CEF-T-2024-SIMOBGEN-VTMIS-WORKS: VTMIS – studies, works or mixed
- CEF-T-2024-SIMOBGEN-eFTI-WORKS: eFTI – studies, works or mixed
- CEF-T-2024-SIMOBGEN-REMIB-WORKS: Removing interoperability barriersstudies, works or mixed
- CEF-T-2024-SIMOBGEN-SESAR-DSDU-WORKS: SESAR digital sky demonstrators for a greener, more scalable and resilient ATM – works
- CEF-T-2024-SIMOBGEN-SESAR-CP-WORKS: SESAR Common Project One implementation projects – works
- CEF-T-2024-SIMOBGEN-SESAR-OP-WORKS: Other ATM Projects – Works or Mixed
The costs will be reimbursed at the funding rates fixed in the Grant Agreement:
- maximum 50% for the costs of studies (not applicable for the SESAR topics)
- maximum 50% for the costs of works
- maximum 70% for the costs of works in outermost regions (not applicable for the RIS and REMIB topics).
The foreseen duration of the works and mixed projects should be 4-5 years maximum. For studies projects it should be 2-3 years maximum. In both cases, the end date set in the Grant Agreement will not be later than 31.12.2029.
Additional information
Topics
Relevance for EU Macro-Region
EUSAIR - EU Strategy for the Adriatic and Ionian Region, EUSALP - EU Strategy for the Alpine Space, EUSBSR - EU Strategy for the Baltic Sea Region, EUSDR - EU Strategy for the Danube Region
UN Sustainable Development Goals (UN-SDGs)
project duration
between 24 and 60 months
Additional Information
All proposals must be submitted electronically via the Funders & Tenders Portal electronic submission system (accessible via the topic page in the Search Funding & Tenders section). Paper submissions are NOT possible.
Proposals must be complete and contain all parts and mandatory annexes and supporting documents, e.g. plan for the exploitation and dissemination of the results including communication activities, etc.
The application form will have two parts:
- Part A (to be filled in directly online) contains administrative information about the participants (future coordinator and beneficiaries and affiliated entities), and the summarised budget for the project
- Part B (to be downloaded from the Portal submission system, completed and then assembled and re-uploaded as a PDF in the system) contains the technical description of the project.
Mandatory annexes and supporting documents (templates available to be downloaded from the Portal Submission System, completed, assembled and re-uploaded):
- detailed budget table per WP/calculator
- activity reports of last year (unless exempted from operational capacity check; see section 7 of call document)
- list of previous projects (key projects for the last 4 years) (template available in Part B)
- timetable/Gantt chart
- agreement of the concerned Member State (letter of support)
- environmental compliance file (for works, for studies with physical interventions and for studies without physical interventions.
For applications concerning projects subject to an EIA, you may include a summary of the climate proofing process in the Portal Submission System under “Other Annexes".
The limit for a full application (Part B) is 120 pages.
Call documents
CEF 2 Transport - Projects related to smart and interoperable mobility (CEF-T-2024-SIMOBGEN)CEF 2 Transport - Projects related to smart and interoperable mobility (CEF-T-2024-SIMOBGEN)(572kB)
Contact
To see more information about this call, you can register for free here
or log in with an existing account.
Log in
Register now